Testing

Every B-L-S shower passes a 150 PSIG hydraulic pressure test. The Piping system is tested at 150 PSIG for a few minutes and any leaky connections or defective fittings (some have blow holes) are replaced and the shower is re-tested before installation of the electrical heating system.

Every B-L-S shower has its electrical system tested for correct electrical resistance and shorts, and replaced if necessary, before installation of the jacket and insulation.

Every electrical system is again checked after completion of the shower to make sure the system was not damaged during the installation of the jacket and insulation.

Quite Simply The Best... 
of Quality, Value and Service!

 

Crating

uncr




B-L-S showers are completely assembled and then crated for shipment to afford maximum protection during shipping.