Quite Simply The Best...
TESTING
Every B-L-S shower passes a 150 PSIG hydraulic pressure test. The Piping system is tested at 150 PSIG for a few minutes and
any leaky connections or defective fittings (some have blow holes) are replaced and the shower is re-tested before installation
of the electrical heating system.
Every B-L-S shower has its electrical system tested for correct electrical resistance and shorts, and replaced if necessary,
before installation of the jacket and insulation.
Every electrical system is again checked after completion of the shower to make sure the system was not damaged during the
installation of the jacket and insulation.
of Quality, Value and Service!